How Long Does a Bathroom Remodel Take? (And How to Cut the Wait)

6 minutes

ZINTEX warehouse stocked with Fast Track shower materials, with the text Select Styles. In-Stock. Installed Quickly.

How long does a bathroom remodel take? A typical professional tub or shower remodel takes six to eight weeks from signed contract to finished bathroom. The install itself usually takes just one or two days. The rest is scheduling, design, and waiting for products to arrive.

You've finally decided that it's time to replace your old shower, but you've got a glaring problem: you don't have a lot of time. Maybe you want to upgrade your guest bathroom, but your in-laws will be staying with you in a month. Maybe the holiday season is coming up quickly, and you don't want to have to worry about installers and project management while also planning your festivities. Is there any way to replace a shower fast?

At ZINTEX Remodeling Group, we're proud partners of Jacuzzi in several of our markets, and together, we're able to offer our Fast Track Program. The Fast Track Program is the perfect solution for homeowners who want to know how to replace a shower on a tight timeline of three weeks or less.

Read on to learn:

  • How long a typical bathroom remodel takes, step by step
  • How long a Fast Track remodel takes
  • How long it takes to replace a bathtub or shower
  • What design options you have using the Fast Track Program
  • How much a shower remodel costs using the Fast Track Program
  • Fast Track shower financing options

Typical Bathroom Remodel Timeline, Step by Step

Every project is different, but most tub and shower remodels follow the same bathroom remodel timeline. Here is where the time goes in a standard project:

  • In-Home Consultation: We usually schedule an in-home estimate within three business days, and the visit takes about one to two hours.
  • Design and Quote: You get an accurate estimate during that same appointment.
  • Product Lead Time: This is where most of the six to eight weeks goes, while we source your materials from the manufacturer and make them installation-ready.
  • Installation: Most tub and shower remodels are completed in one or two days, from demolition and installation to cleanup.

Full bathroom remodels involve more of the room and usually take longer, so ask your design consultant for a project-specific timeline. If your project is a tub or shower replacement, the lead time is the part you can shorten.

How Fast Track Shortens the Bathroom Remodel Timeline

The average professional shower remodel takes an average of six to eight weeks to complete, even if the actual install process takes one or two days. The Fast Track Program brings that timeline down to three weeks or less. Here's a detailed breakdown of what will happen in those three weeks. You can also see everything included in our Fast Track remodel program.

Fast Track Design Consultations

After you schedule your consultation, we can typically get your appointment on the books within three business days. All of our consultations take place in the home, and we ask that both homeowners be present if you are not the sole homeowner.

Our design consultations take about one-two hours, during which your design consultant will assess the current state of your bathroom, your remodeling needs, and your design preferences. You'll get an accurate estimate during that same appointment, eliminating unnecessary delays.

Fast Track Lead Times

Typical bathroom remodels take six weeks or longer largely because of lead times. Between signing your contract and the start of your installation, your remodeling company is sourcing your materials from their manufacturing partner and making sure those materials are installation-ready.

Our Fast Track Program shortens that lead time by 50% or more because we're able to keep Fast Track-eligible materials in our local warehouses. Not only does that mean we can prepare them faster, but it also means that you don't have to worry about unexpected shipping delays.

Fast Track Shower Installation Times

At ZINTEX Remodeling Group, the vast majority of our tub and shower remodels are completed in one or two days. Fast Track shower installations are no different. If you use the Fast Track Program to design your walk-in shower, your ZINTEX installation team will likely be able to complete everything, from demo to cleanup, in two days or less.

How Long Does It Take to Replace a Bathtub or Shower?

Most bathtub and shower replacements take one or two days once the installation team arrives, including demo and cleanup. Replacing a tub and replacing a shower follow a similar install schedule, so the bigger variable is how long you wait for materials. With Fast Track, you can replace a bathtub or shower in three weeks or less from consultation to completion.

For a step-by-step look at shower projects, see our full shower replacement timeline.

How Long Does a Tub-to-Shower Conversion Take?

Tub-to-shower conversions are our most popular project and make up 65% of all ZINTEX remodels. Because the new walk-in shower often uses a similar footprint to the old tub, installation usually takes one or two days, just like a standard tub or shower replacement.

Learn more about our tub-to-shower conversions.

Are My Design Options Limited With the Fast Track Program?

As we mentioned already, our Fast Track Program is designed around our most popular shower materials, fixtures, and accessories. That means that your design options are somewhat limited when you use the Fast Track Program, but not by much.

For example, Jacuzzi shower wall colors available through our Fast Track Program include:

Seaside Jacuzzi shower wall color swatch
Seaside
Champagne Travertine Jacuzzi shower wall color swatch
Champagne Travertine
Midnight Storm Jacuzzi shower wall color swatch
Midnight Storm
Crystal Frost Jacuzzi shower wall color swatch
Crystal Frost
Alabaster White Jacuzzi shower wall color swatch
Alabaster White

You can also choose from many popular shower accessories, including foldable seating, grab bars, and corner shelves.

Does a Faster Bathroom Remodel Cost More?

The products and designs that are available through the Fast Track Program are selected directly from the products and designs that are available through our standard services. That means that you're looking at the same pricing tier with a Fast Track remodel as you are with our typical remodels. For a full breakdown, see our guides to tub-to-shower conversion costs and walk-in shower costs.

Transparent Walk-In Shower Pricing

TierPrice RangeWhat's Included
Basic$11,000 - $16,000Standard Size
Solid Color Base & Wall System
2 Corner Shelves
Basic Shower Head
Shower Rod Enclosure
Grab Bar
Premium Wall System
Bench or Foldable Seating
Intermediate (Most Popular)$16,000 - $19,000Standard Size
Premium Color Base & Wall System
2+ Corner Shelves
Premium Shower Head
Grab Bar
Sliding Glass Enclosure
Bench or Foldable Seating
Deluxe$19,000 - $22,000Oversize or Custom Size
Premium Color Base & Wall System
2+ Corner Shelves
Premium Shower Head + Handheld Diverter
2+ Grab Bars
Sliding Glass Enclosure
Bench or Foldable Seating

Can I Finance a Fast Track Shower Remodel?

Do you have to sacrifice financing options in order to fast-track your shower remodel? The short answer is no! Generally speaking, you will have the same financing options when you use our Fast Track program as you would using our standard services.

As per usual, your financing options will reflect factors like the cost of your remodel and your current credit score. The terms our homeowners typically receive range from zero interest for two years to moderate interest for ten years or more. Most homeowners will have monthly payments between $199 and $400. Learn more about remodel financing here.

Common Questions

Everything else you might be wondering.

How long does it take to remodel a small bathroom?

For a tub or shower replacement, a smaller bathroom usually does not change the install time much. Most installs still take one or two days. The total timeline depends mostly on product lead time, which is why Fast Track can bring it down to three weeks or less.

What slows down a bathroom remodel?

Lead time is the biggest factor, since we have to source and prepare materials before your install date. Scheduling the consultation, shipping delays, and surprises found during demo, such as older plumbing, can also add time.